This page includes all documents which have been uploaded after the initial submission on 17th March.
| Statements of Common Ground |
---|---|
EB_SOCG_01 | GLA and London Boroughs (.pdf, 837.3kB) |
EB_SOCG_02 | Transport for London (.pdf, 787.3kB) |
EB_SOCG_03 | Canal and River Trust (.pdf, 795.9kB) |
EB_SOCG_05 | Thames Water (.pdf, 1.18MB) Affinity Water (.pdf, 1.08MB) |
EB_SOCG_06 | Environment Agency (.pdf, 771.7kB) |
EB_SOCG_07 | The Mayor of London, Represented by the Greater London Authority (.pdf, 526.7kB) |
| Dialogue between the Inspectors and the Council |
---|---|
PINS_01 | Preliminary Inspector Questions 29.04.2020 (.pdf, 91.5kB) |
PINS_02 | |
PINS_03 | |
PINS_04 | |
PINS_05 | Use Class Order changes Addendum to MIQ's (.pdf, 303.7kB) |
Inspector Matters, Issues and Questions (MIQ's)
Matter 1 - Legal and Procedural Requirements | |
---|---|
B/HS01/1 | London Borough Brent Response to Matter 1 (.pdf, 484.2kB) |
HS01/1 | Ikea Property Investments - Matter 1 Hearing Statement (.pdf, 470.7kB) |
Matter 2 - Vision, strategy and objectives | |
---|---|
B/HS02/2 | London Borough Brent Response to Matter 2 (.pdf, 395.1kB) |
Matter 3 - Flood risk | |
---|---|
B/HS03/3 B/HS03/3a B/HS03/3b B/HS03/3c | London Borough Brent Response to Matter 3 (.pdf, 374.1kB) Addendum to Matter 3 - SFRA Level 2 SFRA Level 2 Appendix B (site assessments) Flood Risk Sequential and Exceptions Test update (.pdf, 1.72MB) |
HS02/3 HS02/3a | Environment Agency (EA) - Matter 3 Hearing Statement (.pdf, 115.4kB) Environment Agency (EA) - Matter 3 Final Position Statement 15th September 2020 |
Matter 4 – Strategic transport, infrastructure and delivery | |
---|---|
B/HS04/4 | London Borough Brent Response to Matter 4 (.pdf, 1.09MB) |
HS03/4 | Transport for London (TfL) - Matter 4 Hearing Statement (.pdf, 150.5kB) |
Matter 5 – Housing | |
---|---|
B/BS05/5 B/BS05/5a B/BS05/5b | London Borough Brent Response to Matter 5 (.pdf, 696.2kB) Viability Assessment Addendum to Matter 5 - BH8 Older Persons Housing Viability Assessment Addendum to Matter 5 - BH9 Gypsies and Travellers |
HS04/5 | Quintain - Matter 5 Hearing Statement (.pdf, 692.6kB) |
HS05/5 | Quintain - Matter 5 Further Representations (BH5) (.pdf, 622.8kB) |
HS06/5 | Unite Group - Matter 5 (and 6) Hearing Statements (.pdf, 531.8kB) |
Matter 6 – Economy and town centres | |
---|---|
B/HS06/6 B/HS06/6a B/HS06/6b B/HS06/6c | London Borough Brent Response to Matter 6 (.pdf, 717.8kB) Viability Assessment Addendum to Matter 6 - BE1 Affordable Workspace Viability Assessment Addendum to Matter 6 - BE2 Additional Industrial Typologies Viability Assessment Addendum to Matter 6 - Office Development |
HS07/6 | Braeside Properties - Matter 6 Hearing Statement (.pdf, 830.5kB) |
HS08/6 | Greater London Authority - Matter 6 Hearing Statement (.pdf, 70.4kB) |
HS09/6 HS09/6 | Ikea Property Investments - Matter 6 Hearing Statement (.pdf, 476.3kB) Map of Ikea Land within Wembley Strategic Industrial Land (SIL) |
HS10/6 HS10/6/a | St. George - Matter 6 Hearing Statement (.pdf, 108.7kB) St. George - Matter 6 Supplemental Hearing Statement in Response to B/HS06/6a |
HS11/6 | Unite Group - Matter 6 (and 5) Hearing Statements (.pdf, 531.8kB) |
Matter 7 – Design, Heritage and Culture | |
---|---|
B/HS07/7 B/HS07/7a | London Borough Brent Response to Matter 7 (.pdf, 496.6kB) |
HS12/7 | Quintain - Matter 7 (5 and 6) Hearing Statements |
Matter 8 – Social, green and sustainable infrastructure | |
---|---|
B/HS08/8 B/HS08/8a | London Borough Brent Response to Matter 8 (.pdf, 696.3kB) Update to Policy BSUI3 as Agreed Between the Environment Agency and the Council |
Matter 9 – Places (including Site Allocations) | |
---|---|
B/HSO9/9 | London Borough Brent Response to Matter 9 (.pdf, 4.09MB) |
HS13/9 | Braeside Properties - Matter 9 Hearing Statement |
HS14/9 | Kelaty Properties - Matter 9 (BSSA1) Hearing Statement (.pdf, 924.9kB) |
HS15/9 | London Hotel Group - Matter 9 (BSWSA10) Hearing Statement (.pdf, 6.62MB) |
HS16/9 | St. George - Matter 9 (BSWSA7) Hearing Statement (.pdf, 108.7kB) |
HS17/9 | Quintain - Matter 9 (BCSA2 & BCSA11) Hearing Statement |
Matter 10 – Delivery and monitoring | |
---|---|
B/HS10/10 | London Borough Brent Response to Matter 10 (.pdf, 387.5kB) |
Other documents relating to the Inspector MIQ's |
---|
Core_01a: Brent Draft Local Plan Table of Contents (.pdf, 555.2kB) |
Core_4c: Brent Local Plan Proposed Modifications Consolidated August - September 2020 (.pdf, 504.1kB) This has superseded the proposed modifications for August (Core_04a) and September (Core_04b) as it serves to consolidate them for clarity. |
(Rep. no. 61) Transport for London Commercial Development (TfL CD) Regulation 19 Representation Amendment (.pdf, 1.06MB) - and Explanatory Cover Note (.pdf, 493.9kB) |
The documents included in the below table were required by the Inspectors as a result of the Examination in Public Hearing Sessions. Each document has been produced in response to one of these actions, as identified in the summary spreadsheet which can be accessed here (.xlsx, 32.2kB).
The below table includes all representations received during the Local Plan Main Modifications consultation, which ran from 8 July and 19 August 2021. The Council is now considering its response to these comments.